Stand construction · Samarkand Three stand levels and one question: what do you show
If the product is picked up, a shell scheme is enough. If it must be switched on, plan a custom build. If it arrives by truck, you belong on the open area.
Shell scheme
Octanorm/Moduli: partitions, fascia, lighting, shelves, furniture. Minimal approval, 30-day lead time.
Modular custom
Own geometry, graphics, media wall, demo zone. Design and load calculation 45 days before build-up.
Bespoke build
Timber and mixed structures, two-storey stands, architectural solutions. Drawings, technical supervision, height permit.
Book your stand today
Floor plan and quote within one business day.
| Stage | Deadline | What we need from you |
|---|---|---|
| Application and location | 90–60 days ahead | objective, area, team size |
| Concept and build quote | 60–45 days ahead | brand book, demo needs, budget |
| Working drawings and approval | 40–25 days ahead | signed design, loads, power |
| Graphics printing | 25–14 days ahead | print-ready artwork (checked free of charge) |
| Build-up | arrival day | one or two responsible people from your team |
| Storage until next season | after dismantle | decision: store, scrap, sell |
- Stand height is up to 6 m with approval; standard packages are 2.5 m.
- Partition materials must be non-combustible; certificates provided on request by the safety officer.
- Fixing to hall structures is prohibited; stability must come from the stand itself.
- Open flame, frying and baking only in approved zones with ventilation.
- Power for demo equipment is calculated in advance: 220/380 V with a dedicated breaker.
Book your stand today
Floor plan and quote within one business day.
Need a turnkey stand?
We send build options, a 3D sketch and a quote — including storage between shows.
Book your stand today
Floor plan and quote within one business day.